Today I
-Clecoed HS710 (reinforcement angle) & HS714 (splice angle) to HS702 (fwd spar channels)
-Match drilled holes inboard of HS404/5 rib attach points
-Tapered the ends of HS714 as per drawing 3
Monday, 27 June 2011
Sunday, 26 June 2011
Horizontal Stabiliser - Rear Spar Assy (2.7 Hrs)
Today I smoothed the edges and faces of the HS609PP bars.
-There was a bit of scratching in one of them, but i was able to sand them out.-Next I clecoed the stiffener bars to the spar channel and final drilled all the holes.
-I then enlarged the HS708 attachment holes to #21 size.
-Then I clecoed HS412/413 brackets to spar channel and match drilled them with a #30 drill.
-Next I match drilled the HS411APP through the HS411BPP but i wasn't happy with the alignment of the holes so i scrapped them and have ordered new ones from Van's.
Smoothed Edges and Faces of HS609PP |
Friday, 17 June 2011
Horizontal Stabiliser - Rear Spar Assy (0.4 Hrs)
Today I:
*Broke The edges of both HS609PP bars
*Checked bend of spar channel (HS603PP) in relation to HS609PP
*Rounded the ends of HS-609PP Bars
*Broke The edges of both HS609PP bars
*Checked bend of spar channel (HS603PP) in relation to HS609PP
*Rounded the ends of HS-609PP Bars
Thursday, 16 June 2011
Practise Kit
-Today i finished my second practise kit (the control surface piece) now i'm ready to start the empennage.
Subscribe to:
Posts (Atom)