Monday, 4 July 2011

Horizontal Stabiliser - Fwd Spar Assy (2.2 Hrs)

Today I
-Trimmed the IB ends of 2nd HS702 as per "front spar tab detail" drawing 3
-Marked bend line and cut relief notch on HS702 #2
-I found some deep scratching at the relief notch on HS702 #1 so I have blended them out and emailed vans with measurements and photos
-While I wait for the results from vans I'll build on and redo HS702 #1 If need be.
-Bent tabs on HS 702 #1&2 as per view B-B drawing 3
-Countersunk centre four holes on HS710 & 714 & dimpled centre four holes on HS702.

Relief Notches

Bends Complete
First Dimples
First Countersinks

No comments:

Post a Comment