Thursday, 14 July 2011

Horizontal Stabiliser - Rear Spar Assy (0.8 Hrs)


Today I 
-Received my new HS411BPP & HS411APP Brackets so I clecoed them to the Aft HS spar with the VA146 Bearing sandwiched between them & drilled four of the holes through to the HS411APP as only the HS411BPP is punched with the holes for the hinge bearing
-I then removed the assembly & drilled the remaining two holes
-Next I deburred the parts and primed the VA146 bearing with Tempo Zinc Phosphate Self Etching Primer.
Bearing Assy. Clecoed Ready to Drill
Bearing Assy. Removed to Drill Remaining Two Holes

Bearing Masked Ready to Prime

Priming Bearing

Bearing Primed

No comments:

Post a Comment